|
|
|
|
Looking up the skirt of one of the main canopies. Prior to washing, the canopies and suspension lines are straightened and hung from a special rack.
|
After washing and drying the main chutes, the canopies and suspension lines receive their first detailed inspection here.
|
Main packing table
|
|
|
|
|
Main repair station
|
Main chute deployment bin. One of three.
|
Drogue chute deployment bin. Drogue chute are packed in this bin between the 3 main chute deployment bins
|
|
|
|
|
Main packing table. Suspension lines prepared for stowing in the background
|
Fully packed SRB parachute assembly ready for installation into the top of an SRB. Contained are the three main canopies and their drogue chutes.
|